Product Floor
All 17 products at a glance. Status, progress, owner agent, current blockers, and next milestone. This is the equivalent of the MMS Control Panel's 'All Departments' view — re-lensed for Fotoh Inc.
- •Remove globe (4,716 LOC)
- •Deploy AI backend URL
- •App Store review
- •AI-first redesign (Rule 12)
- •No forms (Rule 18)
- •Masjid discovery crawler
- •Ummah Census pipeline
- •Backend not yet built
- •TV client not started
- •Quran DB integration
- •Accuracy scoring
- •Multi-student queue design
- •Cloudflare Workers deploy
- •Life Sessions D1 migration
- •Khawater video ingestion
- •Lip-sync engine
- •Offline models
- •Voice-first matchmaking flow
- •Family video conference infra
- •Masjid network graph
- •Skills taxonomy
- •Hardware design
- •E-ink firmware
- •501(c)(3) filing
- •Stripe Connect integration
- •Borrower verification AI
- •Agent/broker license
- •Partner insurer selection
- •Pi 5 prototype
- •LoRa mesh firmware
- •AI vision stack
- •Drone integration
- •Robotics partnership
- •Standardized designs
- •Landing page
- •Convert support pipeline
- •Reader→Live-Athan funnel
Agent Crew
11 robots working 24/7. Who is active, who is idle, who is blocked. Session age, context usage, and memory health. This is where context-loss events get caught before they destroy work.
| Agent | Role | Status | Current Task | Session | Context | Products | Memory |
|---|---|---|---|---|---|---|---|
| Liaison | Orchestration + Context Hygiene | Active | Building Fotoh Control Room v1 | 45m | 68% | control-room | ok |
| Agent-AI-Backend | Fotoh AI Cloudflare Workers | Blocked | Waiting on Anthropic API key + Cloudflare account | — | — | 07 | ok |
| Agent-iOS-Live-Athan | iOS SwiftUI — Live Athan | Active | Globe removal + Record Athan polish | 120m | 54% | 01 | ok |
| Agent-Qardon | Qardon platform + iOS integration | Idle | idle | — | — | 12 | ok |
| Agent-MMS | MMS web platform (AI-first) | Idle | idle | — | — | 02 | stale |
| Agent-MIS | Masjid discovery + Ummah Census | Active | Crawler for 1,000 masjid pilot | 60m | 42% | 03, 16 | ok |
| Agent-Methana | Broadcasting + classifiers | Idle | idle | — | — | 04 | ok |
| Agent-Tasmeea-SARD | Hifz + Quran recitation review | Idle | idle | — | — | 05, 06 | stale |
| Agent-Qualify | Qualify landing + convert support | Active | Landing page scaffold | 180m | 35% | 17 | ok |
| Agent-Hardware | Mushaf Cover + MRN + Haris + Builder | Blocked | Waiting on vendor research sign-off | — | — | 11, 14, 15, 16 | ok |
| Agent-QA | Test automation + log scanner | Active | XCTest + log scanner pipeline | 240m | 72% | all | ok |
Velocity & Throughput
The 1-hour standard. Live Athan took 60 days — that is 1,440x slower than target. Cycle times, rework rate, and per-agent averages. This is where we diagnose why Fotoh is slow.
| Task | Planned | Actual | Status |
|---|---|---|---|
| Spec + Handoff (Control Room) | 2h | 2.5h | green |
| Business Plan v1 | 3h | 3.5h | green |
| Qualify Strategy Research | 4h | 4h | green |
| Qardon iOS integration | 8h | 36h | red |
| Live Athan globe removal | 2h | 48h | red |
| Record Athan Design F polish | 6h | 18h | amber |
| AI Backend deploy (initial) | 4h | 72h | red |
| Agent | Avg | Target | Status |
|---|---|---|---|
| Liaison | 2.8h | 1h | amber |
| Agent-iOS-Live-Athan | 18h | 1h | red |
| Agent-Qardon | 22h | 1h | red |
| Agent-AI-Backend | 48h | 1h | red |
| Agent-Qualify | 3.5h | 1h | amber |
| Agent-MIS | 12h | 1h | red |
Roadmap & Deadlines
Sequential Product Perfection (Rule 15). Launch order: Live Athan → Qardon → MMS → MIS. Each milestone has an owner and a status — on-track, at-risk, or pending.
- 2026-05-01At RiskFotoh AI backend live on Cloudflare Pagesowner: Agent-AI-Backend
- 2026-05-15At RiskLive Athan v1.0 Apple review submissionowner: Agent-iOS-Live-Athan
- 2026-06-01On TrackQardon Phase 1 pre-license launchowner: Agent-Qardon
- 2026-06-15On TrackQualify landing page + convert support pipelineowner: Agent-Qualify
- 2026-07-01PendingTasmeea end-to-end hifz loopowner: Agent-Tasmeea-SARD
- 2026-07-15On TrackMIS 1,000 masjids indexedowner: Agent-MIS
- 2026-08-01PendingMethana Masjid Mode pilot (10 masjids)owner: Agent-Methana
- 2026-09-01PendingMMS voice-first skeletonowner: Agent-MMS
- 2026-10-01PendingTranslation real-time Arabic→Englishowner: Agent-Translation
- 2026-11-01PendingMatrimonial + COMPLOY launchowner: Agent-Matrimonial
- 2026-12-01PendingMRN first masjid node liveowner: Agent-MRN
- 2027-01-01PendingQardon Insurance agency phaseowner: Agent-Insurance
Build & Git Health
8 repos, last push time, uncommitted changes, CI state. Rule 7 compliance + disaster recovery rule (push to GitHub after every significant code change).
| Repository | Branch | Last Push | Uncommitted | Status |
|---|---|---|---|---|
| MMS (iOS) | launch-ready-final-2026-04-21 | 18h ago | 2 | green |
| Fotoh-Docs | main | 7h ago | 14 | green |
| Fotoh-AI-Backend | main | 72h ago | 3 | amber |
| Qardon | main | 38h ago | 0 | green |
| MIS | main | 96h ago | 1 | amber |
| MMS-Platform | main | 120h ago | 0 | amber |
| MRN | main | 240h ago | 0 | red |
| Qardon (crypto) | main | 168h ago | 0 | amber |
Safety & Compliance
Hard rules status (Rules 1–23). Context-loss tracking. Documentation freshness. This is where we catch bad robots before they destroy a day of work.
| Rule | Status |
|---|---|
| Rule 1 — Never modify what you don't understand | compliant |
| Rule 2 — Globe in fullScreenCover + LazyView only | n/a (globe being removed) |
| Rule 3 — Audio format guard before installTap | compliant (6 locations verified) |
| Rule 7 — Git safety (no force-push, checkpoint before risk) | compliant |
| Rule 8 — Haram-Audio Firewall | compliant |
| Rule 20 — Context limit warning | compliant |
| Rule 21 — Plan before, result after | partial (results lagging) |
| Rule 22 — One document, one home | compliant |
| Rule 23 — NEXT-SESSION-BRIEF used | partial (4 agents still reading full CLAUDE.md) |